Roanoke issues permits through its Permit Center (540-853-1090) and eTRAKiT. A building permit starts at $50; rezonings go to the Planning Commission.
Last checked Oct. 19, 2026. Facts on this page come from the City of Roanoke’s Permit Center, Planning, Zoning and Permitting, Zoning, Fees, Inspections, Planning Commission, Board of Zoning Appeals and Architectural Review Board pages.
Building, trade and zoning permits in Roanoke come from the city’s Permit Center, part of the Department of Planning, Building and Development, in the Noel C. Taylor Municipal Building, 215 Church Ave. SW. Most applications can be filed online. Rezonings go to the Planning Commission and then City Council, and exceptions to the zoning rules go to the Board of Zoning Appeals. Permit Center: 540-853-1090.
Who to call
- Permit questions and applications: Permit Center, 540-853-1090
- Zoning, rezoning and the Planning Commission: Planning, Building and Development, 540-853-1730, Room 166 South
- Inspections: 540-853-1142; automated scheduling line 540-208-5431
- Code enforcement complaints: 540-853-2344
- Fire permits (events, tents, hot work): Roanoke Fire-EMS Fire Prevention Division, 540-853-2795
How to apply
- Start with the project page. The city’s Project Pages cover more than 40 common jobs, from fences, decks, sheds and pools to additions, solar panels, home businesses and demolition, with what to submit for each.
- Apply online. Use the Permit Counter Apps to apply for a construction or trade permit, ask a technical question or send documents. Licensed contractors can apply for most permits in eTRAKiT, which also takes fee payments, plan uploads and inspection requests. Homeowners can create a public account.
- Expect review times. For a shed or an accessory dwelling, the city allows 10 business days for zoning review and five for building review once the application is complete. Fences for a single-family or two-family home get a five-day building review.
- Pay at issuance. Fees are due when the permit is issued.
Most residential projects need a basic development plan, a simple drawing of the lot showing existing and proposed structures, setbacks, height and paved areas. A design professional is not required for it.
Common projects
- Sheds and detached garages: no building permit is needed for a structure of 256 square feet or less, unless the property is in the H-1 or H-2 historic overlay, the floodplain overlay or the river and creek corridors overlay. Larger structures need a building and zoning permit.
- Fences and walls: reviewed under section 36.2-410 of the zoning code. Show the location, height and type (solid, wire, lattice or picket) on the plan.
- Accessory dwellings: backyard cottages and similar units follow their own process guide on the city’s planning site, planroanoke.org.
- Driveways and sidewalks: a right-of-way excavation permit may be needed for work that touches the street, such as a new driveway connection.
- Water and sewer: new structures may need an availability letter from the Western Virginia Water Authority.
Fees
The city’s fee schedule, effective July 1, 2023, includes:
| Item | Fee |
|---|---|
| Building, trade, demolition and similar permits | $50 plus $6.57 for each additional $1,000 of work value |
| Zoning and building permit together | Building permit fee plus $25 |
| Plan review | 10% of the building permit fee (covers two reviews) |
| Comprehensive development plan | $500 plus $75 an acre |
| Rezoning | $1,000 plus a $500 legal advertising fee |
| Work without a permit | Twice the normal permit fee |
The full fee schedule lists inspections, certificates of occupancy, subdivisions and Board of Zoning Appeals fees.
Inspections
Most permits need at least one inspection, listed on the permit. Request one in eTRAKiT or on the automated line, 540-208-5431. Requests made before 4 p.m. are scheduled for the next business day. Inspectors will not enter an occupied home without a responsible adult present. A permit expires if work does not start within six months or if six months pass with no inspection.
Zoning and your property
Roanoke’s zoning code is Chapter 36.2 of the City Code. To find a property’s zoning, search the address on the city’s Real Estate GIS map and turn on the Planning and Zoning layers. The city recommends that business owners check the zoning before signing a lease or buying a building; a business license needs a zoning verification.
Historic districts
Downtown (the H-1 district) and the Gainsboro and Old Southwest neighborhoods (the H-2 district) have design rules. New construction, exterior changes and demolition there need a certificate of appropriateness from the seven-member Architectural Review Board, which meets the Thursday after the second Monday of each month. The city recommends a meeting with its historic preservation planner, 540-853-1730, before you apply.
Meetings and hearing dates
| Board | When | Next hearings |
|---|---|---|
| Planning Commission | 5:30 p.m., second Monday of the month, City Council Chamber, Room 450 | Nov. 9 and Dec. 14 |
| Board of Zoning Appeals | 5:30 p.m., Wednesday after the second Monday, City Council Chamber | Tuesday, Nov. 10 (moved for the holiday), and Dec. 16 |
| Architectural Review Board | Thursday after the second Monday | Agenda posted on the board’s page |
The Planning Commission advises City Council on rezonings, zoning text changes and street and alley closures; council holds the final hearing, usually the following week. To speak at a Planning Commission or Board of Zoning Appeals hearing, sign up by calling 540-853-1730. Filing deadlines run about six weeks ahead of each Planning Commission hearing and a month ahead of each Board of Zoning Appeals hearing; both calendars are on the boards’ pages.
What this means for you
- Check the project page before you buy materials; a small shed may need no permit, but the same shed in Old Southwest does.
- Working without a permit doubles the fee.
- Rezoning cases on the Planning Commission’s Nov. 9 agenda reach City Council about a week later.
Related guides: Roanoke property taxes, who to call at City Hall and Roanoke history and landmarks.
Frequently asked questions
How do I get a building permit in Roanoke?
Apply online through the city’s Permit Counter Apps or eTRAKiT, or visit the Permit Center in the Noel C. Taylor Municipal Building, 215 Church Ave. SW. Call 540-853-1090 with questions.
Do I need a permit for a shed in Roanoke?
Not if the shed is 256 square feet or smaller, unless the property is in a historic, floodplain or river and creek corridor overlay district. Larger sheds and garages need a building and zoning permit.
Do I need a permit for a fence in Roanoke?
Fences and walls go through the city’s building and zoning permit process, with a basic site plan showing the fence’s location, height and type. The fee is the building permit fee plus $25 for the zoning permit.
How much is a building permit in Roanoke?
The building permit fee is $50 plus $6.57 for each additional $1,000 of the value of the work. Work done without a permit is charged twice the normal fee.
How do I find my property’s zoning in Roanoke?
Search your address or tax map number on the city’s Real Estate GIS map and turn on the Planning and Zoning layers, or call the zoning office at 540-853-1730.
Have your say